There’s a classic thought experiment that asks, “If a tree falls in the woods and nobody is around, does it make a sound?” I like to relate this to design systems. If you create the greatest design system, but there’s no community using it, is it actually great?
This is why, when I took on a new role to lead and renew a legacy design system, I didn’t start with its technical or design debt. I started with its community.
Its trust debt.
I spoke with different teams, design and engineering leads, and stakeholders throughout the organization to learn how they used the system, and to what extent, if at all. Some products had pinned themselves to years-old versions and refused to update. Others had copied components into their local codebase and bypassed the system entirely. Still others had removed the dependency altogether and recreated the components locally. Approximately, of course.
At the center of this drift was a lack of trust in the system, and specifically, its releases. So if we were going to renew the design system and its community, we had to start there.

To better understand where the communal distrust was coming from, I scrolled back through the history of our “Releases” channel in Slack. After only two flicks of the mouse wheel, I got it.
At that time, the system was a single, monolithic package on v89, and Slack showed a flurry of chaotic releases with no changelogs or migration guides. It was impossible for teams to keep up, and with documentation that was little more than an empty Storybook instance, there was little support even if they did manage to do so.
Next, I turned my attention internally to our team. I found no deprecation policy. No governance oversight. One person from one team could make a request, which then became the new top priority, and even if it resulted in a breaking change, we released it as soon as possible.
The idea was that if the design system served a team as quickly as possible, that would create trust. But the same way that you can’t trust a raging bull, you can’t trust a system that’s just as chaotic and unpredictable. By attempting to build trust with one team at a time, we’d break it with the others until there were no bridges left to burn.
I didn’t blame the community for the drift. I understood it. And if we were ever going to stop the bleeding and rebuild those bridges, we needed to shift from frantic, chaotic releases to a more predictable and reliable way of working.

In Josh Clark’s article “Ship Faster by Building Design Systems Slower,” he goes deep into managing different pace layers within design systems. We weren’t helping anybody by churning out chaotic, short-sighted releases. To enable other teams to ship faster, our team needed to slow down and redefine our releases.
We identified our three release categories, then defined each.
While our primary focus was on the major releases, we needed structure at each level.
The severity of the request and the visibility of the end product determined whether a hotfix release was warranted. For example, if a layering bug on our flagship, customer-facing application prevented its login form from being submitted, it needed to be fixed. Immediately. Release cycles be damned.
Thankfully, most requests were less urgent, so we bumped them into the next tier.
Most requests were general fixes, improvements, or features that we lumped into a minor or patch release. We decided to release these versions at the end of every sprint. However, this did require us to update our sprints to run from Wednesday to Wednesday, so that every second Tuesday around lunchtime, we’d publish that sprint’s release.
At the start of each sprint, we created the new release branch. We merged all of our work into it, which automated the release of an updated canary version, providing teams with the latest work at the potential expense of stability. This allowed teams working on a faster layer to adopt the latest changes without waiting until the end of the sprint.
In practice, the benefits of this change far outweighed the change itself.
Sprints now had a purpose. As we applied a level of governance to requests, we began planning, prioritizing, and refining releases, not sprints. And for the community, we now had a predictable release cadence to plan around.
You build trust by showing up when you say you will and doing what you say you will. And when we released at the end of every sprint with documentation, changelogs, and links to Jira tickets, that’s exactly what we did.
To truly rebuild trust within the community, minimize drift, and begin migrating away from ancient, pinned versions, we needed to overhaul how we handled breaking changes.
That meant taking ownership of the design system, its roadmaps, and its vision. We decided to move to an annual major release cycle, breaking each cycle into phases for planning, developing, testing, documenting, and releasing. This gave us a clear structure to keep the work focused and on track.

Before jumping straight into work, we needed clarity on what to build. We planned each release with internal and external sessions aligned with our overall design system roadmap.
We began with the external session with the design, development, and team leads of core products (shoutout to Sophia Levens for the inspiration from my short time at SAP). It opened with an icebreaker in which each person rated their own product’s level of design system adoption, which doubled as a really rough (and overly optimistic) baseline for us to communicate to stakeholders and measure over time.

Then we asked the teams to identify their upcoming needs in buckets of “Immediate (1-3 Months),” “Soon (3-6 Months),” and “Eventually (6-12 Months).” This gave us visibility into shared short- and long-term needs and helped us plan specific features, even if they stretched across multiple buckets.
After that, everybody took notes on what they thought was working well in the current system, what wasn’t working, and their wildest ideas for improvement. Again, it provided an open space to discuss specific issues and ideas for the system from multiple teams’ perspectives at once, as well as identify anything we should keep as-is, or at least have strong reasoning before replacing.
Lastly, with all the notes in place, everybody voted on them, using a set number of votes to create a general, high-level consensus of the overall needs across products.
From there, we had a fairly clear list of short- and long-term needs and preferences from the community. We then brought all of that into our internal planning session, where we merged the feedback with our own goals and backlog for the release. We prioritized specific areas, merged others, and bumped the remaining ones out of the release window.
By the end, we had a Jira release with epics defined, each with an ‘owner’ to serve as the point of contact, and a structured release roadmap in Markdown with links to epics to share. We also added an asterisk next to every note that came directly from the community to highlight its impact on our work and ensure they understood they had some control over the system and, in turn, their own work as well.
We made the release roadmap our most visible asset by pinning it in the Releases and General channels in Slack, publishing it in our documentation, and reviewing it in our monthly info sessions.

Just as we did for our minor and patch releases, at the start of each major version release cycle we created a release branch and automated every merge into it to publish an updated release candidate version, along with a separate Figma release project to keep the current UI library clean of ongoing work. This allowed us to more easily review across design and development, record demos for the monthly info sessions, and trial the changes ourselves.
This phase is also where we implemented our new deprecation policy. Instead of creating tiers of deprecation severities, we went with a single, blanket policy. Deprecations would remain for two major versions before being removed. So anything deprecated in v1 would be removed in v3. Having a clear policy made deprecating not only easier for us but also less chaotic for the community.
As work progressed, we documented breaking changes and their migrations as basic bullet points in a Markdown file. We weren’t yet worried about writing comprehensive migration guides or code mods. Then, in our monthly info sessions and bi-weekly office hours, we previewed upcoming breaking changes and demoed ongoing work. All the materials were available afterward in our dedicated Info Sessions channel.
This phase of the release is the bulk of the work, and with a clearly defined roadmap, ownership of epics, and community engagement, it flies by before you know it. Trust me.

This is when the release became real. With our release candidate versions generally stable, we shared them with core contributor teams to install, migrate, and test. At times, we did this through pairing sessions so we could experience any issues (or successes) firsthand. The process served as a direct line of collaboration, building trust in the upcoming release, while giving products working on a faster layer earlier access to critical features.
We also relied on zeroheight and Storybook to present multiple versions of documentation. This was a common theme for teams that didn’t trust the system, so by supporting the latest version and two previous versions of documentation, similar to our deprecation policy, we didn’t abandon teams if they weren’t always up to date.
Once we’d tightened the release candidates, we were ready to release.

Using the info sessions as our primary form of communication, we announced release windows for the next version throughout the year and gradually tightened them until they became specific dates. The goal was to give the community as much lead time as possible heading into a major version change.
And when that day came, we released.
For the next month, we didn’t plan. We reacted. We lived in the support channels and updated our office hours from bi-weekly to weekly to give the community more opportunities for hands-on pairing. Our only priority was to get as many people migrated as possible.
And once we did, we took a breath, celebrated, and started all over again.

It’s safe to assume that when I joined, the system didn’t have any adoption or usage metrics or survey results for us to properly measure as we moved from v89 to v1, so the results here are anecdotal and far more vibes-based.
But the vibes were good. I swear.
In the months leading up to and following the release, activity in our Slack channels picked up. Questions like “When will this be fixed?” became “Will this be fixed in next week’s release?” — my favorite shift because it shows a growing predictability and reliance on our minor and patch releases. Meanwhile, average attendance at our monthly info sessions and office hours slowly increased, as did interest from teams wanting early access to the release candidate for the next release.
As a team, we had found a better balance between reactive and proactive work, which improved morale after the grind of constant, thankless bug duty. Having a clear plan and roadmap for the design system allowed us to work backward by defining one release at a time. It allowed us to govern requests more clearly, prioritize work, and move in a unified direction.
But the release cycles didn’t immediately fix everything. Some teams didn’t trust that the renewed approach would stick. Others, with old pinned versions, still couldn’t easily migrate, even when they showed renewed interest in doing so. Without more advanced AI migration agents and skills, these products likely wouldn’t update without loads of painful, manual refactoring.
Our work became predictable. Reliable. Steady. Collaborative. Release cycles let us refactor not only design and technical debt, but also the trust debt within the community. Slow and steady. Over and over. One release cycle at a time.
The greatest design systems aren’t always the most technically advanced ones. They’re the systems that people use. The systems that people trust. The systems that enable people to move fast and experiment with slow, stable predictability.
Daniel is speaking about rebuilding trust in legacy design systems at Converge, zeroheight's design systems conference, on October 22, 2026.